Where would you use a putlog scaffold?

Where would you use a putlog scaffold?

Putlog Scaffolds In order to use the wall as support, a putlog, a transom with a flattened end that enables it to rest solidly on the edge of a wall, is used to attach the scaffold to the wall. Putlog scaffolds can only be used on walls with adequate strength to support the weight of the scaffold and the putlog itself.

What is the maximum height of a putlog scaffold?

Design height ✓ Maximum height: 10.0 m to the top lift.

What is a putlog in scaffolding?

Also known as a bricklayer’s scaffold, a putlog scaffold consists of an outer row of vertical members (standards) joined together by ledgers fixed with right-angle couplers. These support the transverse transoms (or putlogs) which are built into the brickwork bed joints as work proceeds.

What are the 3 types of scaffolds?

Workers who use scaffolds can be divided into three groups:

  • Suspended Scaffolds.
  • Supported Scaffolds.
  • Aerial Lifts.

What are 5 requirements for scaffolding?

Five Steps to Safer Scaffolding

  • Start with training.
  • Follow the instructions.
  • Consider the hazards.
  • Use a tagging system.
  • Inspect and re-inspect.

What is a putlog in construction terms?

putlog in American English (ˈpʊtˌlɔg ) noun. in masonry construction, any of the horizontal, wood or metal pieces which support the floor planks of a scaffold and which are themselves supported at one end in holes left temporarily in a wall under construction.

What are the 3 types of scaffolding that are normally used in the construction industry?

Here are the 8 top scaffolding types and how they are being used at the construction sites to support the workforce.

  • Trestle Scaffolding.
  • Steel Scaffolding.
  • Patented Scaffolding.
  • Suspended Scaffolding.
  • Cantilever Scaffolding.
  • Single Scaffolding.
  • Double Scaffolding.
  • Kwikstage Scaffolding.

What is putlog coupler?

The putlog coupler is a non load bearing fitting that connects two scaffold tubes at 90 degrees to each other. They should only be used in the horizontal for connecting transoms to ledgers.

What is the difference between a putlog and independent scaffold?

The difference between independent scaffolding and putlog scaffold is that an independent scaffold relies on two lines of standards to support the working platform, not the building wall. This means that independent scaffolding is separate from the building, and only tied to the building for additional security.

What is another name for putlog?

Scaffolding. Scaffolding, also called staging, is a temporary structure used to support people and material in the construction or repair of buildings and other structures.

What is the difference between a putlog and independent scaffolding?

What is bricklayer scaffold?

Brick layers scaffolding or Single scaffolding. In this type of scaffolding, a series of vertical members made of bamboo or timber (named as Standards), are firmly fixed into the ground in a row parallel to the building wall. The distance in between two standards is generally kept within 2.4 to 3 m.

What is a putlog scaffold?

Putlog Scaffolds. A putlog scaffold consists of a single row of standards, parallel to the face of the building and set as far away from it as is necessary to accommodate a platform of four or five boards wide, with the inner edge of the platform as close to the wall as is practicable.

How many ties do I need for a putlog scaffold?

The same number of ties applies as for an independent tied scaffold. Reveal ties are not recommended for putlog scaffolds.

Why is it called single scaffolding?

Because this scaffolding system consists of one row of standards, it is also referred to as single scaffolding. Putlog scaffold is erected by using a single row of standards and a single ledger. Putlog itself is a component of this scaffolding system, and acts as a link between the ledger and the wall of the building.

What is the purpose of a putlog head?

The purpose of a putlog head is to turn a standard tube into a putlog, so it can be used in the scaffold system. Leave a spot/space in the brickwork at required distances for the flattened end of the transom. Insert a putlog into each space.